Air 5438 Phase 1A – Lead in Fighter Capability Assurance Program (LIFCAP) Full Mission Simulator Facilities (NSW, WA)

Client

Department of Defence

Location

RAAF Base Williamtown, NSWRAAF Base Pearce, WA

Value

$9m

Contract type

HC-1 2003 - Construct Only

Completion

Jun 17

The Air 5438 Phase 1A – LIFCAP Project provided facilities and associated infrastructure for three Full Mission Simulators (FMS) for the upgraded Hawk 127 aircraft. Two Full Mission Simulator Facilities (FMS) were installed at the RAAF Base Williamtown, NSW (WLM) and the RAAF Base Pearce, WA (PEA). The new FMS replaced existing simulators which continued to be fully functional during the construction phase of the Project. The new facilities were constructed in preparation for the supply and installation of the FMS by Defence.

The Project configuration involved the construction of new standalone (approx. 900m2) dedicated simulator facilities at 76 SQN WLM, and a new building of approx. 500m2, adjacent to the existing 79SQN HQ building at PEA.

The works included the following (at each Base):

  • Flight Simulator Halls
  • Computer room
  • General office/staff accommodation
  • Technical storage space
  • Plant rooms
  • Covered link and entries.

Both sites were centred on operational airfields with unique considerations relating to project delivery. Of primary concern was ensuring the safety of all personnel and maintaining the daily operation of each site. St Hilliers were highly conscious of the impact of noise and dust on day-to-day activities and implemented suppression procedures from the outset to minimise the impact of these on operational activities.