St Hilliers has been engaged by the Department of Defence to deliver the Greenbank Training Area MTR: Lethality Systems Project. St Hilliers will oversee the following scope of works:
– Clearing of existing vegetation within the proposed area of works
– Widening of the range floor between the 500 m and 600 m target banks
– Extending the existing 500m and 600m target banks
– Installation of new targetry and associated infrastructure
– Extending the 600 m Environmental Bullet Catcher
– Alterations to the existing stormwater infrastructure to cater for the range floor widening
– Demolition and replacement of existing range signage